Duration: January 2009–December 2010
Budget: €220 000
Commissioned by:
Contractors:
Project director: D. Koutsoyiannis
Principal investigator: P. Papanicolaou
The main objective of the project is to investigate the possibility of exploitation of the underwater springs of Stoupa, in the Municipality of Lefktra. The contribution of NTUA is the evaluation of the possible freshwater capture works from the underwater spring. The project comprises two stages: (a) the investigation of the problem and the development of a methodology for the capture, transport and temporary storage of the freshwater, which includes field work in a pilot study, and the construction and testing of the temporary pilot facility, and (b) the outline of the works required for the transport and storage of potable water.
Documents: